TGUP Project - Kiahuko Primary School: Water Supply Installation in Kenya 2022
Kiahuko Primary School: Water Supply Installation

, , ,

Project # 228 of 272
   

The Kiahuko Primary School will be renovated with 8 different projects. The top priority project is to bring water to the school. The local Health authorities have threatened to shut down the school unless they gain access to water. This project entailed cutting through the tarmac of the road to reach the main water source and then laying piping to the school. The pipes were then connected to four 5,000 liter water tanks.

  • Project Summary https://tgup.org/pdf/Kiahuko-Water-Project-Summary.pdf
  • Project Details https://tgup.org/pdf/Kiahuko-Primary-School-Project-Details.pdf
  • https://tgup.org
  • https://tgup.org
  • https://tgup.org5
  • https://tgup.org
  • https://tgup.org
  • https://tgup.org
  • Project Cost: $4,903
Cutting through road
Connected to tanks
Connected to tanks

TGUP Partners: Kiini Sustainable Initiative (KISI) and

Uplift  for a Better World

Visitors 184