TGUP: Completed Projects in South Africa
31 Completed Projects in South Africa

1 - Freedom Preschool: Upgrade

South Africa, 2012, Education

Project #26 of 413

After the preschool teachers at Freedom Preschool had received their training and certification in early childhood education, we installed shelves, educational posters, tables, chairs, and hanging racks for backpacks. We also painted inside and outside walls including putting educational murals on the walls.

Painting the exterior
Painting the interior

TGUP Partner: COPT

2 - Thato Day Care Center: Upgrade

South Africa, 2012, Education

Project #27 of 413

Working with our South African partners, we painted walls, tables, chairs and other furniture, and created educational posters. We then painted murals on the inside and outside walls and installed hangers for backpacks. This created an ideal environment for the recently qualified teachers to work at Thato Preschool and Daycare.

Upgrade in progress
Finished front

TGUP Partner: COPT

3 - Bophelong Preschool: Upgrade

South Africa, 2012, Education

Project #28 of 413

We renovated the preschool and installed monkey bars and a jungle gym with slide, fireman's pole and drum. These are the first gross motor skills structures the students have ever had. The staff were recently trained in best practices for preschool teaching and are excited to now have the environment to best teach the children.

Teacher and students
With TGUP group

TGUP Partner: COPT

4 - Thato Day Care Center: Upgrade

South Africa, 2013, Education

Project #32 of 413

Last year we renovated Thato Preschool and daycare. This year we installed a jungle gym to encourage gross motor skill development. We also put in a rainwater catchment system of gutters, pipes and a storage tank. It will reduce the need to carry water from a centralized distribution point. TGUP volunteers helped with the work.

Jungle gym delivery
Jungle gym play

TGUP Partner: COPT

5 - Letabong Preschool: Upgrade

South Africa, 2013, Education

Project #33 of 413

We painted the walls with educational murals and installed shelves for books, games, and educational materials. Then we built cribs for the nap room. After painting the outside of the school we installed playground equipment, including monkey bars and a jungle gym. The children were amazed when they saw the improvements!

Prepped for murals
Jungle gym arriving

TGUP Partner: COPT

6 - Nthabiseng Preschool: Upgrade

South Africa, 2013, Education

Project #34 of 413

Nthabiseng was a good preschool with excellent teachers but the building looked drab. We painted the inside and outside walls and hung educational murals and posters. We also built shelves, and assembled tables, chairs, and baby cribs. The school looked very unexciting when we arrived, but now looks bright and inviting.

Delivering materials
Renovated exterior

TGUP Partner: COPT

7 - Lesedi Preschool: Upgrade

South Africa, 2013, Education

Project #35 of 413

At Lesedi Preschool we painted walls, added murals and installed shelves, tables, chairs and hanging racks for backpacks. We also re-painted two jungle gyms, the name board and the outside fence. We worked on a weekend so the school didn't have to close, and once the paint was dry we delivered new educational supplies.

Renovated inside
TGUP group outside

TGUP Partner: COPT

8 - Nthabiseng Preschool: Upgrade

South Africa, 2013, Education

Project #36 of 413

Earlier work had upgraded the interior and exterior of the school. In this project we installed monkey bars and a jungle gym. The combination makes for a world of difference in how the students experience their school. The children were intrigued by the equipment, but it didn't take them long to learn how to use the playground!

Jungle gym delivery
Jungle gym play

TGUP Partner: COPT

9 - Food Storage: Upgrade

South Africa, 2013, Infrastructure

Project #37 of 413

Good daycare and preschool places are desperately short in the area, so in order to offer daycare to as many families as possible, the carers needed a place to store food and to use as an office. We installed a storage unit that came with two windows, and laid cement floors, installed shelves, and strengthened the door.

Warehouse site
Warehouse interior

TGUP Partner: COPT

10 - Welfare Office: Upgrade

South Africa, 2013, Infrastructure

Project #38 of 413

We purchased a storage unit and had it installed for use as the office of a local social welfare group working in the township of Tembisa, a poor area about half way between Johannesburg and Pretoria. A cement floor was put down, shelves were installed, and the door was strengthened. They can now add furniture and supplies.

New welfare office
Interior of office

TGUP Partner: COPT

11 - Tembisa Township: Computer Lab

South Africa, 2013, Education

Project #44 of 413

We provided 10 netbook computers to populate a computer lab in the Johannesberg township of Tembisa. The lab provides vocational computer-based training to hundreds of local students and job aspirants. Graduates of the training programs receive a certificate of accomplishment and are able to apply for better jobs.

Training in laptop use
New graduates

TGUP Partner: COPT

12 - Pooh's Corner Preschool: Upgrade

South Africa, 2014, Education

Project #50 of 413

We painted walls, added educational murals and installed shelves, educational posters, and hanging racks for backpacks. We supplied child sized tables and chairs and installed a swing set. We also donated stationery and other teacher supplies to the teachers who had been recently trained in early childhood education.

Upgrade in progress
After the upgrade

TGUP Partner: COPT

13 - Bright Life Preschool: Upgrade

South Africa, 2014, Education

Project #51 of 413

One of the rooms at Bright Life Daycare was very dark and uninviting. The owner wanted it to be light and welcoming so we cut two openings and installed windows. We then renovated the inside and outside of the building and provided the center with child-sized tables and chairs, as well as fun educational supplies.

Making windows
Upgrade finished

TGUP Partner: COPT

14 - Shoko Preschool: Upgrade

South Africa, 2014, Education

Project #52 of 413

The owner of Shoko Preschool had just finished her training and apprenticeship and was preparing to open the school. We installed a new front door, added an interior wall, and renovated, painted and decorated the whole building. We installed monkey bars and a jungle gym, and donated educational supplies ready for the opening.

Jungle gym delivery
Jungle gym installed

TGUP Partner: COPT

15 - Nthabiseng Preschool: Upgrade

South Africa, 2015, Education

Project #56 of 413

The 2013 upgrade allowed the school to expand enrollment. This time, we renovated a second building including interior and exterior painting and decorating with educational murals. We built shelves and assembled tables, chairs, and cribs. We also repaired fencing and repainted the school's playground equipment.

Upgraded classroom
Upgraded exterior

TGUP Partner: Cuddle Trust

16 - Tutulekesedi Preschool: Upgrade

South Africa, 2015, Education

Project #57 of 413

We painted walls, added murals, hung educational posters, and built shelves for books and games. We also donated educational supplies. Outside, we installed a water catchment system with gutters, pipes and a large water storage tank. We also donated and installed a set of monkey bars and a jungle gym in the playground.

Jungle gym play
Water catchment

TGUP Partner: Cuddle Trust

17 - Dineo Preschool: Upgrade

South Africa, 2015, Education

Project #58 of 413

Dineo Preschool needed a major renovation. TGUP student volunteers helped to paint walls, and add murals before we installed shelves for books and educational toys. We then installed new tables, chairs, hangers for backpacks and baby cots. A set of monkey bars and a jungle gym completed the renovation.

New entry sign
Monkey bar fun

TGUP Partner: Cuddle Trust

18 - Machachaba Preschool: Upgrade

South Africa, 2015, Education

Project #59 of 413

The teachers at Machachaba recently completed their updated certification in early childhood education and knew that the whole facility needed to be upgraded. We helped by painting and decorating all the roooms, and providing bright new tables, chairs, cribs and preschool supplies. The ladies are excited by the new curriculum.

Children looking out
Upgraded room

TGUP Partner: Cuddle Trust

19 - World of Saints Preschool: Jungle Gym

South Africa, 2015, Recreation

Project #60 of 413

We installed monkey bars and a jungle gym. None of the children had ever had a structure on which to exercise their gross motor skills and their upper bodies were very weak. They were amazed when a TGUP student showed them how to use it! When we returned on our next trip the children were easily climbing all over the equipment.

Waiting to play
Trying the slide

TGUP Partner: Cuddle Trust

20 - Mvelaphanda Preschool: Upgrade

South Africa, 2015, Education

Project #61 of 413

This property is located on top of a garbage dump, but the teachers have gradually converted it to a beautiful preschool. We helped with painting, decorating and installing a water catchment system. The school is so well respected that people from the town want to send their children to this township school, but it is full.

Before upgrade
After the upgrade

TGUP Partner: Cuddle Trust

21 - Little Angel Preschool: Upgrade

South Africa, 2016, Education

Project #71 of 413

We upgraded Little Angel Preschool in Tembisa, a large township about an hour north of Jahannesburg. In addition to painting the preschool inside and out, and painting educational murals, we cleaned up the school yard, installed a jungle gym and water catchment system, and donated child sized tables and chairs.

Jungle gym arrival
Finished upgrade

TGUP Partner: Cuddle Trust

22 - Kidebone's Preschool: Upgrade

South Africa, 2016, Education

Project #72 of 413

Kidebone's Preschool needed a full renovation of the facilities and equipment. Inside, we repaired and painted the ceilings and walls, and installing new shelving. Then we added new child-sized tables, chairs and nap mats. Outside we painted and decorated, and installed a water catchment system and some playground equipment.

Before upgrade
Renovated play area

TGUP Partner: Cuddle Trust

23 - Greater Glory Preschool: Upgrade

South Africa, 2016, Education

Project #73 of 413

At Greater Glory Preschool we painted and decorated all the inside walls, repaired and painted ceilings, and installed new shelving. We also provided nap mats and educational supplies for the children. Ouside, we painted and added murals to walls, and installed a jungle gym, new play equipment and a water catchment system.

Yard full of donations
Renovated classroom

TGUP Partner: Cuddle Trust

24 - Salome's Preschool: Upgrade

South Africa, 2016, Education

Project #74 of 413

At Salome's Preschool we replaced some broken metal siding, a roof and windows. Then we painted educational murals, cleaned cleaned up the yard, set up a jungle gym and installed a water catchment system. TGUP student volunteers helped with all the work, and the following day went back and enjoyed playing with the children.

Old inside
New inside

TGUP Partner: Cuddle Trust

25 - Community Center: Upgrade

South Africa, 2016, Infrastructure

Project #75 of 413

We fixed up the exterior of a building that is used as a community volunteer center. The volunteers based here work wherever they are most needed in the Tembisa Township of Johannesburg. The township has a population of almost 470,000 with very few services: no garbage pickup, and many areas without running water or electricity.

TGUP hard at work
Finished walls

TGUP Partner: Cuddle Trust

26 - Heavenly Preschool: Upgrade

South Africa, 2017, Education

Project #83 of 413

We completely renovated 3 preschool rooms including repairing, painting and decorating interior and exterior walls. We installed a jungle gym and donated educational toys, books and tables and chairs.

Painting outside wall
Delivering donations

TGUP Partner: Cuddle Trust

27 - Jack and Jill Preschool: Upgrade

South Africa, 2017, Education

Project #84 of 413

The interior and exterior walls were prepped and painted, then decorated with shapes and numbers. A climbing frame, children's tables and chairs, and a teacher's desk were installed, as well as a hanging rack for backpacks.

Newly painted wall
Jungle gym happiness

TGUP Partner: Cuddle Trust

28 - Putfontein School: Upgrade

South Africa, 2017, Education

Project #85 of 413

We converted a storage room into a Pre-K classroom and built a multi-part balancing structure. A large wall mural was painted and the walkway to the Pre-K room was painted with lots of games to encourage gross motor play.

TGUP group painting
New balance beam

TGUP Partner: Cuddle Trust

29 - Reya Gona: Disabled Care Center

South Africa, 2017, Health

Project #87 of 413

We built a care facility for physically disabled children. The facility will provide a safe place for the children, and also offer physical therapy, occupational therapy and educational training to children and their parents.

Framing a wall
Therapist and child

TGUP Partner: Cuddle Trust

30 - Save a Girl 2017S: Save a Girl SA 17

South Africa, 2017, Health

Project #89 of 413

We gave health education and reusable sanitary supplies to 200 girls in Tembisa. They can now attend school every week and reach their educational potential. Without the kits most would have dropped out of school.

Happy recipient
Sample kit

TGUP Partner: Cuddle Trust

31 - Community Center: Laptops

South Africa, 2017, Education

Project #93 of 413

Los Altos High School donated 15 laptops which are being used to teach computer skills at the community center in the Tembisa township. Without these skills the people remain consigned to manual labor work.

Computer skills class
World just opened up

TGUP Partner: Cuddle Trust

Uplift  for a Better World

Visitors 11437